This section will update you on the progress of our storm shelter.  Check back from time to time to see photos.

The hallway from the main building to the new storm shelter/gymnasium is taking shape.

IMG_3974 IMG_3976 IMG_3977

The walls to the walkway are going up. Feb. 26, 2016.

feb 26 constuction side - Copy feb 26 construction feb 26 construction looking in

IMG_3786 2 11 16 IMG_3785 2 11 16 IMG_3696 roof work IMG_3691 1 7 16

Inside. 2/11/16
Inside. 2/11/16
Roof work. 2/11/16
Roof work. 2/11/16

We are seeing progress (12/8/2015)

Construction 11-20 DConstruction 12-8 BConstruction 12-8 Cconstruction 12-8 DConstruction 12-8 E

The construction begins (11/20/2015)

Construction 11-20 AConstruction 11-20 Bconstruction 11-20 CConstruction 12-8 A